INTERNATIONAL & CB
International certifications
IEC / CB scheme reports and multi-country conversion — one test covering several markets.
IEC 60950-1 — IT equipment safety
IEC 60950-1; IEC 60950-21 / -22; CB Scheme; IEC 62368-1
Request a quote →CB certification (IECEE)
IEC 62368-1 / IEC 62109 / IEC 62619 / IEC 62933 | 25–30 | conversion
Request a quote →IEC international test report
IEC 62368-1 / IEC 62109 / IEC 62619 / IEC 62933 | 8–10 | conversion
Request a quote →GS mark (Germany)
EN 62368-1 / EN 60335 / EN 62109 | 30 | conversion
Request a quote →TÜV MARK
EN 62368-1 / EN 62109 / EN 62619 | 30 | conversion
Request a quote →India BIS
IEC 62368-1 / IS 16046 | 40–45 | conversion
Request a quote →Taiwan BSMI
IEC 62368-1 / CNS 14336-1 | 30–45 | conversion
Request a quote →South Korea KC
KC 62368-1 / KC 62619 / KC 62109 | 30–45 | conversion
Request a quote →Japan PSE (circular)
IEC 62368-1 + Japan deviations | 7–10 | conversion
Request a quote →Japan PSE (diamond)
J 62368-1 | 40 | conversion
Request a quote →Australia SAA / RCM
AS/NZS 62368-1 / AS/NZS 4777 | 15–25 | conversion
Request a quote →Australia test report
AS/NZS 62368-1 / AS/NZS 4763 | 10 | conversion
Request a quote →USA UL / cTUVus
UL 62368-1 / UL 1741 / UL 2743 | 30 | conversion
Request a quote →USA ETL
UL 62368-1 / UL 1741 | 30 | conversion
Request a quote →USA UL test report
UL 62368-1 | 10 | conversion
Request a quote →UK UKCA
BS EN 62368-1 / BS EN 62109 / BS EN 62920 | per project | conversion
Request a quote →Saudi SASO / SABER
SASO 2870 / IEC 62368-1 | per project | conversion
Request a quote →EAEC EAC
TR CU 004/2011 / TR CU 020/2011 | per project | conversion
Request a quote →South Africa NRCS
SANS 62368 / SANS 62133 | per project | conversion
Request a quote →Thailand — TISI mandatory certification
TIS 63056 / IEC 62619. Type 5 type test + factory inspection, valid 3 years with annual surveillance; 60–90 working days
Request a quote →Malaysia — SIRIM PCS mandatory certification
IEC 62619 / IEC 62040. Type 5 long-term (1 year, factory inspection + surveillance) or Type 1B batch (single shipment); Type 5 about 45–60, Type 1B about 15–20 working days
Request a quote →Indonesia — SNI mandatory certification
SNI IEC 62619 / SNI IEC 62933. Testing at an Indonesian KAN laboratory plus factory inspection, certificate issued to a local company; 60–90 working days
Request a quote →Vietnam — MIC DoC conformity declaration
QCVN 101:2020/BTTTT / IEC 62133. Self-declaration plus registration; 10–20 working days
Request a quote →Philippines — PS licence or ICC per shipment
PNS IEC 62619. PS long-term (3 years, annual factory audit) about 60–90 working days; ICC per shipment about 10–15 working days
Request a quote →CE safety — portable lithium battery (secondary)
EN IEC 62133-2. Self-declaration plus technical file; 15–30 working days
Request a quote →CE safety — primary lithium cell
EN IEC 60086. Self-declaration plus technical file; 15–25 working days
Request a quote →EU Battery Regulation 2023/1542
Carbon footprint / DPP digital passport / supply-chain due diligence / EPR registration. Module by module: EPR registration about 7–15 working days, carbon footprint about 30–45, DPP scoped per project
Request a quote →REACH SVHC screening
EC 1907/2006. Testing plus declaration; 10–20 working days
Request a quote →South Africa — NRCS LOA
SANS 62133 (lithium) / SANS 60086 (primary). LOA application plus SABS testing; 30–45 working days
Request a quote →Nigeria — SONCAP certificate
SON regulated standard + IEC 62133. PC1 per-shipment testing and inspection about 7–10 working days; PC3 licence (factory inspection, 1 year) about 30–45
Request a quote →Kenya — PVOC certificate of conformity
KEBS regulated standard + IEC 62133. Pre-shipment inspection and testing, COC issued; 5–10 working days
Request a quote →Uganda — PVOC certificate of conformity
UNBS regulated standard + IEC 62133. Pre-shipment inspection and testing, COC issued; 5–10 working days
Request a quote →Tanzania — PVOC certificate of conformity
TBS regulated standard + IEC 62133. Pre-shipment inspection and testing, COC issued; 5–10 working days
Request a quote →Ghana — COC pre-shipment certificate
GSA regulated standard + IEC 62133. Pre-shipment inspection and testing, COC issued; 5–10 working days
Request a quote →Algeria — COC certificate of conformity
Standard of an AQSIQ-recognised body. Pre-shipment inspection and testing, COC issued; 7–12 working days
Request a quote →Egypt — GOEIC registration
EOS regulated standard + IEC 62133. Product registration plus inspection; 15–25 working days
Request a quote →West Africa — ECTN / BESC / BIETC / FERI
Customs rules of the destination country. One per bill of lading, arranged before shipment; 3–7 working days
Request a quote →Mongolia — MASM certificate of conformity (BESS)
MNS IEC 62619 / IEC 62933-5-2. Product conformity certificate or type approval, valid 3 years; 45–75 working days
Request a quote →Mongolia — grid-project approvals (ERC, NDC, NEMA)
Mongolian Energy Law + IEC 62933 series. Project approval plus grid-connection agreement; 60–120 working days
Request a quote →Mongolia — MASM certificate of conformity (portable lithium)
MNS IEC 62133. Product conformity certification; 30–45 working days
Request a quote →UN38.3 test report
UN Recommendations on the Transport of Dangerous Goods, section 38.3. Eight safety tests; 15–25 working days
Request a quote →MSDS / SDS
GHS, 16 sections. Preparation plus review; 3–7 working days
Request a quote →Dangerous-goods packaging certificate
UN packaging performance certificate + use appraisal. Customs declaration; 7–15 working days
Request a quote →Cargo transport condition appraisal
Sea / air transport appraisal. Laboratory appraisal; 5–10 working days
Request a quote →Wall switch · electronic · IEC / CE / UKCA
IEC/EN 60669-2-1
Request a quote →Appliance switch · mechanical · IEC / CE / UKCA
IEC/EN 61058-1/-1-1
Request a quote →In-line switch · IEC / CE / UKCA
IEC/EN 61058-1/-2-1
Request a quote →Automatic control · IEC / CE / UKCA
IEC/EN 60730-1
Request a quote →Timer / time switch · IEC / CE / UKCA
IEC/EN 60730-1/-2-7
Request a quote →Temperature-sensitive control · IEC / CE / UKCA
IEC/EN 60730-1/-2-9
Request a quote →Plug · IEC
IEC 60884-1
Request a quote →Socket-outlet · IEC
IEC 60884-1
Request a quote →Extension socket · IEC
IEC 60884-1+IEC 60884-2-7
Request a quote →Plug adapter · IEC
IEC 60884-1+IEC 60884-2-5
Request a quote →Travel adapter · IEC
IEC 60884-1+IEC 60884-2-5
Request a quote →Coupler · IEC / CE / UKCA
IEC/BS/EN 60320-1
Request a quote →LV switch · IEC/EN
IEC/EN 60947-1
Request a quote →LV connector · IEC/EN
IEC/EN 60998-1
Request a quote →Connector · IEC/EN
IEC/EN 61984
Request a quote →USB port · IEC/EN
IEC/EN62680-1-1
Request a quote →USB Type-C port · IEC/EN
IEC/EN62680-1-2
Request a quote →CB certification for high bay (IEC 60598-2-3)
IECEE CB scheme | IEC 60598-1 + IEC 60598-2-3 | one report converted into many national approvals
Request a quote →Israel MOC type approval (conversion)
Israel Ministry of Communications | type approval | convertible from CB, CE RED or FCC reports
Request a quote →Philippines NTC type approval (conversion)
National Telecommunications Commission | type approval or type acceptance | converted from FCC or CE reports
Request a quote →Thailand NBTC type approval (conversion)
NBTC National Broadcasting and Telecommunications Commission | Class A and Class B | converted from CE or FCC reports
Request a quote →Cell CB certification to IEC 62133-2
IECEE CB / IEC 62133-2 / forced internal short circuit
Request a quote →1.2 m free-fall drop test (packaging and cells)
ISTA / UN 38.3 packaging / six faces, three edges, one corner
Request a quote →Lithium battery IEC 61960 performance testing
Capacity / cycle life / charge retention / internal resistance
Request a quote →Lithium battery IEC/EN 62133 safety testing
IEC 62133-2 / EN 62133-2 / cells and packs
Request a quote →No standalone item in this category yet — contact us for a combined scope.
Inquiry / Request a quote
Tell us what you need, we reply within 24 hours.
×WeChat
17722522312
Same number as our phone. Search it in WeChat to add us, or call 17722522312

One-stop testing and certification for ESS and lithium batteries — UN38.3, IEC 62619, CE, UL, FCC and more.
Contact
+86 177 2252 2312- sunny.lcs@powcert.com
- Juji Industrial Park, Shajing, Bao'an District, Shenzhen, China
© 2026 LCS Testing Group. All rights reserved.