LCS TESTING LAB

ISO 8124 and IEC 62115 test report

ISO 8124; IEC 62115 / toys and children’s products

ISO 8124 and IEC 62115 test report

ISO 8124 and IEC 62115 test report turns on age grading and the mechanical, flammability and chemical lines: fix the applicable edition and age group for the destination, then sample detachable parts and coatings separately so one report covers that market.

Key point: Confirm the age grading and the destination route before fixing test items and sample splits.
Lead time
2–4 weeks
Sample quantity
3 units, chemical parts counted separately
Test items
9 items
Deliverables
Report + conformity file
STANDARDS

Regulations and standards

Regulation / directive / standardStandardsScope
Applicable rulesISO 8124; IEC 62115Scope set by age group and toy category
Mechanical and physicalEN 71-1 / ISO 8124-1 / ASTM F963Small parts, sharp points, edges, cords, stability
FlammabilityEN 71-2 / ISO 8124-2 / 16 CFR 1500.44Key for headwear, costumes and plush
Migration of elementsEN 71-3 / ISO 8124-3 / 16 CFR 130319 elements, or 8 soluble heavy metals
Organic chemistryEN 71-9 to 11 / 8 phthalates / azo dyesMouth-contact and skin-contact parts
Electrical safety (powered)EN 62115 / IEC 62115 / ASTM F963 electrical clausesBattery compartments, charging, temperature rise
TESTS

Main test items

Each item below is run against the standard listed above with raw data recorded on site; the report gives measured values and a pass/fail verdict per item, and one re-test after corrective action is included.

01
Mechanical and physical tests
02
Stability and load tests
03
Flammability test
04
Migration of 19 elements
05
Eight phthalates
06
Azo dyes and aromatic amines
07
Battery compartment and coin-cell safety
08
Electrical safety and temperature rise
09
Marking, age warning and manual review
Not sure which of the 8 test items apply to your model? Send the datasheet, rating-label photo and where the report will be used — an engineer replies within 24 hours with the applicable item list and a schedule. Talk to an engineer →
SAMPLES

Samples and documents

  • 3 main units plus component samples
  • BOM and supplier list
  • Age grading, packaging and manual artwork
  • Battery and charging details for powered toys
LEAD TIME

Lead time and deliverables

2–4 weeks for the report; corrective re-testing adds 1–2 weeks.

Test report, conformity statement or certificate and a technical file list.

For shipping or tender deadlines we can run safety first and follow with EMC and efficiency in a second batch; for an updated model in the same series an existing report can be reused with only the differences retested.
Request a quote and plan

Inquiry / Request a quote

Tell us what you need, we reply within 24 hours.

×

WeChat

17722522312

Same number as our phone. Search it in WeChat to add us, or call 17722522312

LCS

One-stop testing and certification for ESS and lithium batteries — UN38.3, IEC 62619, CE, UL, FCC and more.

Contact

+86 177 2252 2312
© 2026 LCS Testing Group. All rights reserved.
Scroll to Top