LCS TESTING LAB

Australian test report

AS/NZS 62368-1 / AS/NZS 4763 / CB and existing report conversion

Australian test report

Australia test report works by conversion rather than new development: an existing CB or IEC report forms the basis, national differences are added, and the local body issues the certificate. The critical step is confirming the report edition, model coverage and the difference clauses, or the application is returned for re-testing.

Key point: Confirm the base report edition and model coverage before scoping differences; a rejected edition is the most common cause of a returned application.
Lead time
quoted per project
Sample quantity
Usually no samples; 1–2 units for difference testing
Test items
6 items
Deliverables
Certificate + number
STANDARDS

Regulations and standards

Regulation / directive / standardStandardsScope
Base reportCB or IEC reportEdition and standard year must be accepted locally
National differencesDifference clauses in AS/NZS 62368-1 / AS/NZS 4763Differences must be tested or assessed
Model coverageSeries models and component differencesUncovered models need separate testing
Local holderImporter or locally registered entityCertificate and number tied to the local entity
Marking and registrationLocal mark and registration numberLabel must match the certificate
TESTS

Main test items

Each item below is run against the standard listed above with raw data recorded on site; the report gives measured values and a pass/fail verdict per item, and one re-test after corrective action is included.

01
Base report applicability review
02
Model coverage and component comparison
03
Testing of national difference clauses
04
Label and manual localisation review
05
Local application and issuance
06
Registration number and certificate check
Not sure which of the 8 test items apply to your model? Send the datasheet, rating-label photo and where the report will be used — an engineer replies within 24 hours with the applicable item list and a schedule. Talk to an engineer →
SAMPLES

Samples and documents

  • CB or IEC report and certificate
  • Model list with difference notes
  • Critical component list and certificates
  • Local importer or holder details
  • Label and manual artwork
LEAD TIME

Lead time and deliverables

quoted per project to complete the conversion; difference testing extends the schedule.

Local certificate or registration number, difference assessment note and a label review.

For shipping or tender deadlines we can run safety first and follow with EMC and efficiency in a second batch; for an updated model in the same series an existing report can be reused with only the differences retested.
Request a quote and plan

Inquiry / Request a quote

Tell us what you need, we reply within 24 hours.

×

WeChat

17722522312

Same number as our phone. Search it in WeChat to add us, or call 17722522312

LCS

One-stop testing and certification for ESS and lithium batteries — UN38.3, IEC 62619, CE, UL, FCC and more.

Contact

+86 177 2252 2312
© 2026 LCS Testing Group. All rights reserved.
Scroll to Top