Grid-tied inverter testing (Mongolia energy law + IEC 62933 series)
Mongolia energy law + IEC 62933 series / grid performance and protection / utility acceptance
Grid-tied inverter testing (Mongolia energy law + IEC 62933 series)
A grid-tied inverter sold into destination markets needs more than safety and EMC: the destination grid code governs voltage and frequency ranges, low-voltage ride-through, harmonics and flicker, anti-islanding, power factor and active power control. Testing follows Mongolia energy law + IEC 62933 series and the report is accepted by the utility or its recognised body. The same hardware needs separate reports per country, with parameters and curves re-measured to local rules.
Regulations and standards
| Regulation / directive / standard | Standards | Scope |
|---|---|---|
| Mongolia energy law + IEC 62933 series voltage and frequency ranges | Steady-state and transient operating windows | Trip and reconnect times recorded per band |
| Low-voltage ride-through | Dip depth and duration | Active-power recovery rate must follow the required curve |
| Power quality | Harmonics, inter-harmonics, flicker, DC component | Each harmonic judged against the limit |
| Protection | Over/under voltage, over/under frequency, anti-islanding | Both active and passive anti-islanding verified |
| Control and communication | Power factor, active-power limit, remote dispatch interface | Grid protocol and communication point list reviewed |
Main test items
Each item below is run against the standard listed above with raw data recorded on site; the report gives measured values and a pass/fail verdict per item, and one re-test after corrective action is included.
Samples and documents
- 2 inverters with data acquisition and grid-connection panel
- Schematic, control parameter table and firmware version
- Existing safety and EMC reports
- Grid topology and point-of-connection description
- Target standard edition and accepting body
Lead time and deliverables
60–120 working days for the report; on-site grid witnessing or dispatch commissioning is scheduled per project.
Grid test report, parameter and curve data package, and the annex list the utility requires.
Inquiry / Request a quote
Tell us what you need, we reply within 24 hours.
17722522312
Same number as our phone. Search it in WeChat to add us, or call 17722522312

One-stop testing and certification for ESS and lithium batteries — UN38.3, IEC 62619, CE, UL, FCC and more.
Contact
+86 177 2252 2312- sunny.lcs@powcert.com
- Juji Industrial Park, Shajing, Bao'an District, Shenzhen, China