LCS TESTING LAB

Grid-tied inverter testing (Mongolia energy law + IEC 62933 series)

Mongolia energy law + IEC 62933 series / grid performance and protection / utility acceptance

Grid-tied inverter testing (Mongolia energy law + IEC 62933 series)

A grid-tied inverter sold into destination markets needs more than safety and EMC: the destination grid code governs voltage and frequency ranges, low-voltage ride-through, harmonics and flicker, anti-islanding, power factor and active power control. Testing follows Mongolia energy law + IEC 62933 series and the report is accepted by the utility or its recognised body. The same hardware needs separate reports per country, with parameters and curves re-measured to local rules.

Key point: Confirm the destination’s acceptance rules and how the report will be used first; one report often serves several markets, with differences scoped separately.
Lead time
60–120 working days
Sample quantity
2–3 units
Test items
7 items
Deliverables
Reports + declarations
STANDARDS

Regulations and standards

Regulation / directive / standardStandardsScope
Mongolia energy law + IEC 62933 series voltage and frequency rangesSteady-state and transient operating windowsTrip and reconnect times recorded per band
Low-voltage ride-throughDip depth and durationActive-power recovery rate must follow the required curve
Power qualityHarmonics, inter-harmonics, flicker, DC componentEach harmonic judged against the limit
ProtectionOver/under voltage, over/under frequency, anti-islandingBoth active and passive anti-islanding verified
Control and communicationPower factor, active-power limit, remote dispatch interfaceGrid protocol and communication point list reviewed
TESTS

Main test items

Each item below is run against the standard listed above with raw data recorded on site; the report gives measured values and a pass/fail verdict per item, and one re-test after corrective action is included.

01
Steady-state voltage and frequency range
02
Low-voltage ride-through and recovery rate
03
Harmonic and inter-harmonic current emission
04
Flicker and DC component
05
Anti-islanding, active and passive
06
Power factor and active/reactive power control
07
Communication and dispatch interface at the point of connection
Not sure which of the 7 test items apply to your model? Send the datasheet, rating-label photo and where the report will be used — an engineer replies within 24 hours with the applicable item list and a schedule. Talk to an engineer →
SAMPLES

Samples and documents

  • 2 inverters with data acquisition and grid-connection panel
  • Schematic, control parameter table and firmware version
  • Existing safety and EMC reports
  • Grid topology and point-of-connection description
  • Target standard edition and accepting body
LEAD TIME

Lead time and deliverables

60–120 working days for the report; on-site grid witnessing or dispatch commissioning is scheduled per project.

Grid test report, parameter and curve data package, and the annex list the utility requires.

For shipping or tender deadlines we can run safety first and follow with EMC and efficiency in a second batch; for an updated model in the same series an existing report can be reused with only the differences retested.
Request a quote and plan

Inquiry / Request a quote

Tell us what you need, we reply within 24 hours.

×

WeChat

17722522312

Same number as our phone. Search it in WeChat to add us, or call 17722522312

LCS

One-stop testing and certification for ESS and lithium batteries — UN38.3, IEC 62619, CE, UL, FCC and more.

Contact

+86 177 2252 2312
© 2026 LCS Testing Group. All rights reserved.
Scroll to Top