LCS TESTING LAB

CE safety certification — primary lithium battery (destination markets compliance)

EN IEC 60086 / technical file and declaration / runs alongside CE

CE safety certification — primary lithium battery (destination markets compliance)

CE safety certification — primary lithium battery is a horizontal requirement in destination markets: full-unit testing is not always needed, but a traceable technical file, supplier declarations and the necessary test data are. It runs alongside CE safety and EMC and does not replace them; when materials or suppliers change the file must be updated, or a market surveillance check cannot be answered.

Key point: Confirm the destination’s acceptance rules and how the report will be used first; one report often serves several markets, with differences scoped separately.
Lead time
15–25 working days
Sample quantity
2–3 units
Test items
6 items
Deliverables
Reports + declarations
STANDARDS

Regulations and standards

Regulation / directive / standardStandardsScope
EN IEC 60086 scopeProduct categories and limitsDecide first whether the product is in scope
Technical fileBOM, material declarations, test reportsThe file must cover the models actually shipped
Supply-chain declarationsSupplier CoC or test dataHigh-risk parts are sampled and verified separately
Marking and declarationDeclaration of conformity, registration and labelsDeclaration must match the report data
MaintenanceMaterial changes, regulation revisionsRe-assess on a revision or a material change
TESTS

Main test items

Each item below is run against the standard listed above with raw data recorded on site; the report gives measured values and a pass/fail verdict per item, and one re-test after corrective action is included.

01
Scope and limit review
02
BOM and material declaration audit
03
Sampling and testing of high-risk parts (XRF or quantitative chemistry)
04
Technical file drafting and archiving
05
Declaration and label review
06
Cross-check shipped models against the file scope
Not sure which of the 6 test items apply to your model? Send the datasheet, rating-label photo and where the report will be used — an engineer replies within 24 hours with the applicable item list and a schedule. Talk to an engineer →
SAMPLES

Samples and documents

  • BOM and material composition list
  • Supplier declarations or existing reports
  • Labels and manual
  • List of shipped models
LEAD TIME

Lead time and deliverables

15–25 working days for the file and any necessary testing; documentation-only assessment takes 5–10 working days.

Technical file, declaration template, test data and a label review.

For shipping or tender deadlines we can run safety first and follow with EMC and efficiency in a second batch; for an updated model in the same series an existing report can be reused with only the differences retested.
Request a quote and plan

Inquiry / Request a quote

Tell us what you need, we reply within 24 hours.

×

WeChat

17722522312

Same number as our phone. Search it in WeChat to add us, or call 17722522312

LCS

One-stop testing and certification for ESS and lithium batteries — UN38.3, IEC 62619, CE, UL, FCC and more.

Contact

+86 177 2252 2312
© 2026 LCS Testing Group. All rights reserved.
Scroll to Top