LCS TESTING LAB

Portable power station — CE certification

CE / EN IEC 62368-1 / EN 62619 / EMC / Battery Regulation

Portable power station — CE certification

A portable power station shipped into the EU sits under the Low Voltage Directive, the EMC Directive and the EU Battery Regulation at the same time; add the Radio Equipment Directive when Bluetooth or Wi-Fi monitoring is built in. Typical units run 300 W to 2 kW with 220–240 V AC output, USB-C PD and solar input.

Key point:Declaration of Conformity (DoC), full test reports, technical construction file (TCF) and an EU authorised representative checklist.
STANDARDS

Directives and standards

Directive / regulationStandardsScope
Low Voltage Directive 2014/35/EUEN IEC 62368-1:2020+A11Whole-unit safety: construction, temperature rise, insulation, earthing, shock protection
EMC Directive 2014/30/EUEN IEC 61000-6-3 / 61000-6-1; EN 55032 / 55035Radiated and conducted emissions, ESD, surge, EFT, voltage dips
Radio Equipment Directive 2014/53/EU (if wireless)EN 300 328 / EN 301 893; EN 301 489-1/-17RF power, occupied bandwidth, spurious emissions, radio EMC
EU Battery Regulation (EU) 2023/1542Carbon footprint declaration, battery passport, recycled content, labelling, due diligencePhased from 2025 — check which articles apply before shipping
RoHS 2011/65/EUEN IEC 63000 technical documentationTen restricted substances in homogeneous materials
Cell and pack safetyIEC 62133-2; IEC 62619 / EN 62619Overcharge, over-discharge, short circuit and thermal runaway assessment
Transport and take-backUN38.3 + MSDS; WEEE 2012/19/EUAir and sea transport report, take-back marking and registration
TESTS

Main test items

01
Construction check and rating label review (incl. EU responsible person)
02
Temperature rise and abnormal operation
03
Overcharge, over-discharge, external short circuit
04
Drop, vibration, crush
05
Dielectric strength and earthing continuity
06
EMC radiated and conducted emissions
07
ESD, surge, EFT and voltage dip immunity
08
RF power and spurious emissions (wireless models)
09
BMS protection verification
SAMPLES

Samples and documents

  • 2–3 units with adapters and cables
  • Cell datasheet, UN38.3 report and MSDS
  • Schematic, BOM and critical component list
  • Rating label and manual (CE mark, EU responsible person)
  • Radio module datasheet and existing approvals (wireless models)
  • BMS schematic and protection parameters
LEAD TIME

Lead time and deliverables

4–6 weeks for the report; 5–7 weeks with wireless functions; add 1–2 weeks if re-testing after fixes.

Declaration of Conformity (DoC), full test reports, technical construction file (TCF) and an EU authorised representative checklist.

Request a quote and plan

Inquiry / Request a quote

Tell us what you need, we reply within 24 hours.

×

WeChat

17722522312

Same number as our phone. Search it in WeChat to add us, or call 17722522312

LCS

One-stop testing and certification for ESS and lithium batteries — UN38.3, IEC 62619, CE, UL, FCC and more.

Contact

+86 177 2252 2312
© 2026 LCS Testing Group. All rights reserved.
Scroll to Top